Détails des produits

Created with Pixso. À la maison Created with Pixso. Produits Created with Pixso.
Transformer Test Bench
Created with Pixso.

Automatic 10kV Transformer Reactor Integrated Test System With Reserved Upgrade Interfaces

Automatic 10kV Transformer Reactor Integrated Test System With Reserved Upgrade Interfaces

Nom De Marque: Or-electric
Numéro De Modèle: ORTSS-U-10kV
Nombre De Pièces: 1 ensemble
Price: 16000~30000 USD/set
Conditions De Paiement: D/P, T/T, Western Union, MoneyGram
Capacité à Fournir: 100 ensembles/an
Informations détaillées
Lieu d'origine:
WUHAN, CHINE
Certification:
ISO9001,ISO14001,ISO45001
Stanadard:
GB 50150 / IEC 60076-3
Structure:
De type divisé / intégré
Mode de câblage:
Manuel / automatique
Mode de contrôle:
Manuel / plc + ordinateur + him / plc + ordinateur / plc + him
Communication:
RS232 / RS485 / Ethernet / USB
Fréquence:
50 Hz/60 Hz
Tension maximale de l'objet à tester:
10 kV
Capacité maximale de l'objet de test:
Pour l'aéronef
Garantie:
1 an
Code HS:
9030390000
Détails d'emballage:
Boîte en bois
Délai de livraison:
30 JOURS OUVRABLES
Mettre en évidence:

Automatic Transformer Reactor

,

Transformer Reactor Integrated

,

10kV Transformer Test System

Description du produit

ORTSS-U-10kV  Transformer/Reactor Integrated Test System (With Reserved Upgrade Interfaces)


I. Product introduction

10kV transformer/reactor integrated test system (with reserved upgrade interfaces) is designed in strict accordance with relevant standards such as GB 50150/IEC 60076-3. It adopts high-end office desk-style control console and is equipped with a large LCD display, which is both beautiful and practical. It can perform no-load  test, load test, power-frequency voltage withstand test, induced voltage withstand tests, etc. All tests can be automated without complex operations and manual calculations, the test results are automatically calculated and saved. With reserved upgrade interfaces, it has strong scalability, 35kV tested objects can be detected after adding high-voltage capacitor control cabinets and high-voltage metering cabinets,etc.


II. Electric tests (customizable)

● No-load test        

● Load test

● Power-frequency voltage withstand test

● Induced voltage withstand test


III. Configuration list (customizable)

Equipment name

QTY

(set)

Note

Test system console

Control bench

1

Include HIM touch screen and well-known brand electronic components

Power analyzer

1

4U chassis

Industrial computer

1

Advantech

Test software system

1

Written in Visual Studio, dedicated to comprehensive test control and measurement

LCD

1

27-inch

LV auxiliary control cabinet

Control cabinet

1

Include Siemens PLC and well-known brand electronic components

Current transformer

3

Dry-type, 0.05 class

LV capacitor bank

1

3-phase

Induced electric voltage regulator

1

Oil-immersed,with casters

Generator set

1

50Hz/150Hz

AC test transformer

1

Optional protection resistor, voltage divider and peak meter


IV. Warranty period & after-sale service

● The warranty period for the products supplied by the supplier is 12 months from the date of product acceptance or 15 months from the date of the last piece of equipment arrival, whichever comes first. Within the warranty period, the supplier shall provide free services to the purchaser; After the warranty period, the supplier will only charge a cost fee for the expenses incurred in repairing the equipment.
● All products come with lifetime maintenance services.


V. Company profile

Automatic 10kV Transformer Reactor Integrated Test System With Reserved Upgrade Interfaces 0