35kV Dry Transformer Test Station - Zhejiang Project

35kV Dry Transformer Test Station - Zhejiang Project

2026-01-11

In July 2025, our company delivered the 35kV dry transformer test station to Ningbo Aoneng Electric Co., Ltd., which passed the acceptance inspection and was put into normal operation.The test station consists of automatic test line(3 sets),TEMP-rise test system(2 sets),and DC resistance & trun ratio test system(3 sets),which can complete DC resistance,turn ratio, insulation resistance, no-load, load, power frequency, induced,harmonic, and TEMP-rise testing for the dry transformer with 35kV, 25000kVA and below. Each automatic test line adopts a 2-position design and can detect up to 30-45 units/day.