products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Transformer Test Bench
Created with Pixso.

Electrical Transformer Test Bench 35kV Integrated Transformer / Reactor Test System

Electrical Transformer Test Bench 35kV Integrated Transformer / Reactor Test System

Brand Name: Or-electric
Model Number: ORTOS-35kV
MOQ: 1 set
Price: 45000~245000 USD/set
Payment Terms: D/P,T/T,Western Union,MoneyGram
Supply Ability: 200 sets/year
Detail Information
Place of Origin:
Wuhan,China
Certification:
ISO9001,ISO14001,ISO45001
Stanadard:
GB 50150/IEC 60076-3
Structure:
Split-type/Integrated
Wiring Mode:
Manual/Automatic
Control Mode:
Manual/PLC+Computer
Communication:
RS232/RS485/Ethernet/USB
Frequency:
50Hz/60Hz
Max Test Object Voltage:
35kV
Max Test Object Capacity:
25000kVA
Warranty:
1 Year
HS Code:
9030390000
Packaging Details:
Wooden Box
Delivery Time:
60 work days
Highlight:

Transformer Test Bench 35kV

,

Electrical Transformer Test Bench

Product Description

ORTOS-35kV Transformer/Reactor Integrated Test System (One-body)


I. Product introduction

35kV transformer/reactor integrated test system (one-body) is designed in strict accordance with relevant standards such as GB 50150/IEC 60076-3. It adopts a box structure with a small size and low space occupancy. It can perform DC resistance test, no-load test, load test, induced voltage withstand test, temperature rise test, etc. It is simple to operate and easy to install and debug. There is no need for on-site guidance from engineers. The operator can connect the power cord and test line to complete all tests on the control box.


II. Electric tests (customizable)

● DC resistance test

● No-load test

● Load test

● Induced voltage withstand test

● Temperature rise test


III.Configuration list (customizable)

Equipment name

QTY

(set)

Note

Test system control box

Control box

1

Include power input control, variable-frequency power output control,step-up test transformer control,transformer installation and range adjustment control, capacitor installation and group switching control, etc., using well-known brand components

Industrial computer & accessories

1

Advantech industrial computer/19-inch embedded display/EAST rack-mount UPS/isolation transformer.

Test software system

1

Written in Visual Studio, dedicated to comprehensive test control and measurement

PLC control system

1

Siemens PLC, used for comprehensive testing of electrical equipment control

Power analyzer

1

4U chassis

Variable-frequency power supply

1

45Hz~300Hz, adjustable

LV capacitor bank

1

3-phase

Step-up test transformer

1

Electric switching

HV capacitor bank

1

1-phase

Current transformer

3

Dry-type, 0.05 class

Voltage transformer

3

Dry-type, 0.05 class

DC resistance test

1

4U chassis, Dual-channel

Temperature inspection instrument

1

16-channel, include 16 temperature detection wires

(5 m/pc), TP100 probe


IV. Warranty period & after-sale service

● The warranty period for the products supplied by the supplier is 12 months from the date of product acceptance or 15 months from the date of the last piece of equipment arrival, whichever comes first. Within the warranty period, the supplier shall provide free services to the purchaser; After the warranty period, the supplier will only charge a cost fee for the expenses incurred in repairing the equipment.
● All products come with lifetime maintenance services.


V. Company profile

Electrical Transformer Test Bench 35kV Integrated Transformer / Reactor Test System 0