products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Transformer Test Bench
Created with Pixso.

Customizable 10kV Transformer Reactor Test System Integrated Split Type

Customizable 10kV Transformer Reactor Test System Integrated Split Type

Brand Name: Or-electric
Model Number: ORTSS-10kV
MOQ: 1 set
Price: 14000~28000 USD/set
Payment Terms: D/P,T/T,Western Union,MoneyGram
Supply Ability: 100 sets/year
Detail Information
Place of Origin:
Wuhan,China
Certification:
ISO9001,ISO14001,ISO45001
Stanadard:
GB 50150/IEC 60076-3
Structure:
Split-type/Integrated
Wiring Mode:
Manual/Automatic
Control Mode:
Manual/PLC+Computer+HIM/PLC+Computer/PLC+HIM
Communication:
RS232/RS485/Ethernet/USB
Frequency:
50Hz/60Hz
Max Test Object Voltage:
10kV
Max Test Object Capacity:
2500kVA
Warranty:
1 Year
HS Code:
9030390000
Packaging Details:
Wooden Box
Delivery Time:
30 work days
Highlight:

10kV Transformer Reactor Test System

,

Transformer Reactor Test System Integrated

Product Description

ORTSS-10kV Transformer/Reactor Integrated Test System (Split-type)


I. Product introduction

10kV transformer/reactor integrated test system (split-type) is designed in strict accordance with relevant standards such as GB 50150/IEC 60076-3. It adopts a steel structure control console with compact structure and high cost performance. It can perform no-load test, load test, power-frequency voltage withstand test, induced voltage withstand test, etc. All tests can be automated without complex operations and manual calculations, the test results are automatically calculated and saved.


II. Electric tests (customizable)

● No-load test.

● Load test.

● Power-frequency voltage withstand test.

● Induced voltage withstand test.


III. Configuration list (customizable)


Equipment name

QTY

(set)

Note

Test system console

Control bench

1

Include HIM touch screen, Siemens PLC and well-known brand electronic components

Power analyzer

1

4U chassis

Industrial computer & LCD

1

Advantech, one-body

Test software system

1

Written in Visual Studio, dedicated to comprehensive test control and measurement

Current transformer

3

Dry-type,0.05 class

LV capacitor bank

1

3-phase

Induced electric voltage regulator

1

Oil-immersed,with casters

Generator set

1

50Hz/150Hz

AC test transformer

1

Optional protection resistor, voltage divider and peak meter


IV. Warranty period & after-sale service

● The warranty period for the products supplied by the supplier is 12 months from the date of product acceptance or 15 months from the date of the last piece of equipment arrival, whichever comes first. Within the warranty period, the supplier shall provide free services to the purchaser; After the warranty period, the supplier will only charge a cost fee for the expenses incurred in repairing the equipment.
● All products come with lifetime maintenance services.


V. Company profile

Customizable 10kV Transformer Reactor Test System Integrated Split Type 0