Detalles de los productos

Created with Pixso. En casa Created with Pixso. Productos Created with Pixso.
Transformer Test Bench
Created with Pixso.

Customizable 10kV Transformer Reactor Test System Integrated Split Type

Customizable 10kV Transformer Reactor Test System Integrated Split Type

Nombre De La Marca: Or-electric
Número De Modelo: ORTSS-10kV
Cuota De Producción: 1 juego
Price: 14000~28000 USD/set
Condiciones De Pago: D/P, T/T, Western Union, dinero gram
Capacidad De Suministro: 100 sistemas/año
Información detallada
Lugar de origen:
WUHAN, CHINA
Certificación:
ISO9001,ISO14001,ISO45001
Stanadard:
GB 50150/IEC 60076-3
Estructura:
Tipo dividido/integrado
Modo de cableado:
Manual/automático
Modo de control:
Manual/plc+computadora+él/plc+computadora/plc+him
Comunicación:
RS232/RS485/Ethernet/USB
Frecuencia:
50HZ/60HZ
Voltaje máximo del objeto de prueba:
10 kV
Capacidad máxima del objeto de prueba:
2500kva
Garantía:
1 año
Código Hs:
9030390000
Detalles de empaquetado:
Caja de madera
Tiempo de entrega:
30 DÍAS LABORALES
Resaltar:

10kV Transformer Reactor Test System

,

Transformer Reactor Test System Integrated

Descripción del producto

ORTSS-10kV Transformer/Reactor Integrated Test System (Split-type)


I. Product introduction

10kV transformer/reactor integrated test system (split-type) is designed in strict accordance with relevant standards such as GB 50150/IEC 60076-3. It adopts a steel structure control console with compact structure and high cost performance. It can perform no-load test, load test, power-frequency voltage withstand test, induced voltage withstand test, etc. All tests can be automated without complex operations and manual calculations, the test results are automatically calculated and saved.


II. Electric tests (customizable)

● No-load test.

● Load test.

● Power-frequency voltage withstand test.

● Induced voltage withstand test.


III. Configuration list (customizable)


Equipment name

QTY

(set)

Note

Test system console

Control bench

1

Include HIM touch screen, Siemens PLC and well-known brand electronic components

Power analyzer

1

4U chassis

Industrial computer & LCD

1

Advantech, one-body

Test software system

1

Written in Visual Studio, dedicated to comprehensive test control and measurement

Current transformer

3

Dry-type,0.05 class

LV capacitor bank

1

3-phase

Induced electric voltage regulator

1

Oil-immersed,with casters

Generator set

1

50Hz/150Hz

AC test transformer

1

Optional protection resistor, voltage divider and peak meter


IV. Warranty period & after-sale service

● The warranty period for the products supplied by the supplier is 12 months from the date of product acceptance or 15 months from the date of the last piece of equipment arrival, whichever comes first. Within the warranty period, the supplier shall provide free services to the purchaser; After the warranty period, the supplier will only charge a cost fee for the expenses incurred in repairing the equipment.
● All products come with lifetime maintenance services.


V. Company profile

Customizable 10kV Transformer Reactor Test System Integrated Split Type 0